OPINION OF THE COURT
TALK AMERICA, INC. V. MICHIGAN BELLTELEPHONE CO.
564 U. S. ____ (2011)
SUPREME COURT OF THE UNITED STATES
NOS. 10-313 AND 10-329
TALK AMERICA, INC., PETITIONER
10–313
v.
MICHIGAN BELL TELEPHONE COMPANY dba
AT&T MICHIGAN
ORJIAKOR ISIOGU, et al., PETITIONERS
10–329
v.
MICHIGAN BELL TELEPHONE COMPANY dba
AT&T MICHIGAN
on writs of certiorari to the united states court
of appeals for the sixth circuit
[June 9, 2011]
Justice Thomas delivered the
opinion of the Court.
In these cases, we consider
whether an incumbent provider of local telephone service must make
certain transmission facilities available to competitors at
cost-based rates. The Federal Communications Commission (FCC or
Commission) as
amicus curiae[Footnote 1] contends that its regulations require the
incumbent provider to do so if the facilities are to be used for
interconnection: to link the incumbent provider’s telephone network
with the competitor’s network for the mutual exchange of traffic.
We defer to the Commission’s views and reverse the judgment
below.
I
The Telecommunications Act of
1996 (1996 Act), 110 Stat. 56, imposed a number of duties on
incumbent providers of local telephone service in order to
facilitate market entry by competitors.
AT&T Corp. v.
Iowa Utilities Bd.,
525 U. S. 366, 371
(1999). The incumbent local ex-change carriers (LECs) owned the
local exchange networks: the physical equipment necessary to
receive, properly route, and deliver phone calls among customers.
Verizon Communications Inc. v.
FCC,
535 U. S. 467, 490
(2002). Before the 1996 Act, a new, competitive LEC could not
compete with an incumbent carrier without basically replicating the
incumbent’s entire existing network.
Ibid.
The 1996 Act addressed that
barrier to market entry by requiring incumbent LECs to share their
networks with competitive LECs in several ways, two of which are
relevant here. First, 47 U. S. C. §251(c)(3) requires
incumbent LECs to lease “on an unbundled basis”—i.e., a la
carte—network elements specified by the Commission. This makes it
easier for a competitor to create its own network without having to
build every element from scratch. In identifying which network
elements must be available for unbundled lease under §251(c)(3),
the Commission is required to consider whether access is
“necessary” and whether failing to provide access would “impair” a
competitor’s provision of service. §251(d)(2). Second, §251(c)(2)
mandates that incumbent LECs “provide … interconnection” between
their networks and competitive LECs’ facilities. This ensures that
customers on a competitor’s network can call customers on the
incumbent’s network, and vice versa. The interconnection duty is
independent of the unbundling rules and not subject to impairment
analysis. It is undisputed that both un-bundled network elements
and interconnection must be provided at cost-based rates. See
§252(d)(1); Brief for Petitioner in No. 10–313, p. 28; Brief
for Petitioners in No. 10–329, p. 7; Brief for Respondent
4.
These cases concern incumbent LECs’ obligation
to share existing “entrance facilities” with competitive LECs.
Entrance facilities are the transmission facilities (typically
wires or cables) that connect competitive LECs’ networks with
incumbent LECs’ networks. The FCC recently adopted a regulation
specifying that entrance facilities are not among the network
elements that §251(c)(3) requires incumbents to lease to
competitors on an unbundled basis at cost-based rates. See 47 CFR
§51.319(e)(2)(i) (2005). The Commission noted, however, that it
“d[id] not alter the right of competitive LECs to obtain
interconnection facilities pursuant to section 251(c)(2).”
In re Unbundled Access to Network Elements, 20 FCC
Rcd. 2533, 2611, ¶140 (2005)
(Triennial Review Remand
Order).
The specific issue here is whether respondent,
Michigan Bell Telephone Company d/b/a AT&T Michigan (AT&T),
must lease existing entrance facilities to competitive LECs at
cost-based rates. The FCC interprets its regulations to require
AT&T to do so for the purpose of interconnection. We begin by
reviewing the Commission’s recent actions regarding entrance
facilities and then explain the particular dispute that is before
us today.
A
In 2003, the FCC decided,
contrary to its previous orders, that incumbent LECs were not
obligated to provide cost-based unbundled access to entrance
facilities under §251(c)(3).
In re Review of Section 251
Unbundling Obligations of Incumbent Local Exchange Carriers,
18 FCC Rcd. 16978, 17202–17205, ¶¶365–367 (2003)
(Triennial
Review Order). Explaining that its previous approach had been
“misguided” and “overly broad,”
id., ¶¶366, 365, the
Commission concluded that entrance facilities were not subject to
the unbundling requirement because they are not network elements at
all. See
id., ¶366 (entrance facilities “exist
outside the incumbent LEC’s local network”). The
Commission therefore did not conduct an impairment analysis.
The FCC emphasized, however, the
limits of this ruling. Entrance facilities are used for two
purposes: interconnection and backhauling.[
Footnote 2] It expressly “d[id] not alter” an incumbent
LEC’s obligation under §251(c)(2) to provide “facilities in order
to ‘interconnect with the incumbent LEC’s network.’ ”
Id., ¶366 (brackets omitted). Thus, al-though the
Commission specified that §251(c)(3) did not require any unbundled
leasing of entrance facilities, it determined in practical effect
only that “incumbent LECs [were not obligated] to unbundle
[entrance facilities] for the purpose of backhauling traffic.”
Id., ¶365.
On direct review, the D. C. Circuit
questioned the Commission’s determination that entrance facilities
are not network elements under §251(c)(3), but found the agency
rulemaking record insufficient and remanded to the Commission for
further consideration. See
United States Telecom Assn. v.
FCC, 359 F. 3d 554, 586, cert. denied,
543 U. S. 925 (2004).
The court noted that if entrance facilities were in fact
“ ‘network elements,’ ” then “an analysis of impairment
would presumably follow.” 359 F. 3d, at 586.
In 2005, the Commission responded. See
Triennial Review Remand Order ¶¶136–141. The Commission
re-treated from its view that entrance facilities are not network
elements but adhered to its previous position that cost-based
unbundled access to them need not be provided under §251(c)(3).
Id., ¶¶137–138. Treating entrance facilities as network
elements, the Commission concluded that competitive LECs are not
impaired without access to them
. Ibid. The
Commission again emphasized that it “d[id] not alter the right of
competitive LECs to obtain interconnection facilities pursuant to
section 251(c)(2).”
Id., ¶140.
B
In the wake of the
Triennial
Review Remand Order, AT&T notified competitive LECs that
it would no longer provide entrance facilities at cost-based rates
for either backhauling or interconnection, but would instead charge
higher rates. Competitive LECs complained to the Michigan Public
Service Commission (PSC) that AT&T was unlawfully abrogating
their right to cost-based interconnection under §251(c)(2). The
Michigan PSC agreed with the competitive LECs and ordered AT&T
to continue providing entrance facilities for interconnection at
cost-based rates.
AT&T challenged the Michigan
PSC’s ruling in the District Court, which, relying on the
Triennial Review Remand Order, ruled in AT&T’s favor.
The Michigan PSC and several competitive LECs, including petitioner
Talk America, Inc., appealed.
The Court of Appeals for the Sixth Circuit
affirmed over a dissent.
Michigan Bell Telephone Co. v.
Covad Communications Co., 597 F. 3d 370 (2010). At
the court’s invitation, the FCC filed a brief as
amicus
curiae, arguing that the
Triennial Review Remand
Order did not change incumbent LECs’ interconnection
obligations, including the obligation to lease entrance facilities
for interconnection. The Sixth Circuit declined to defer to the
FCC’s views, 597 F. 3d, at 375, n. 6, and also expressly
disagreed with the Seventh and Eighth Circuits,
id., at
384–386 (discussing
Illinois Bell Tel. Co. v.
Box, 526 F. 3d 1069 (2008), and
Southwestern Bell
Tel., L. P. v.
Missouri Pub. Serv. Comm’n, 530
F. 3d 676 (2008)).[
Footnote
3]
We granted certiorari, 562 U. S. ___ (2010),
and now reverse.
II
Petitioners contend that AT&T
must lease its existing entrance facilities for interconnection at
cost-based rates. We agree.
A
No statute or regulation squarely
addresses whether an incumbent LEC must provide access to entrance
facilities at cost-based rates as part of its interconnection duty
under §251(c)(2). According to the statute, each incumbent LEC
has:
“The duty to provide, for the
facilities and equipment of any requesting telecommunications
carrier, interconnection with the local exchange carrier’s
network—
“(A) for the transmission and routing of
telephone exchange service and exchange access;
“(B) at any technically feasible point within
the carrier’s network;
“(C) that is at least equal in quality to that
provided by the local exchange carrier to itself or to any
subsidiary, affiliate, or any other party to which the carrier
provides interconnection; and
“(D) on rates, terms, and conditions that are
just, reasonable, and nondiscriminatory, in accordance with the
terms and conditions of the agreement and the requirements of this
section and section 252 of this title.”
Nothing in that language expressly addresses
entrance facilities. Nor does any regulation do so. See Brief for
United States as
Amicus Curiae 22, n. 6.
AT&T contends that the statute makes clear
that an incumbent LEC need not provide access to
any
facilities—much less entrance facilities—to provide
interconnection. The company points out that §251(c)(2) does not
mention incumbent LECs’ facilities, but rather mandates only that
incumbent LECs provide interconnection “for the facilities and
equipment of any [competing] carrier.” In contrast, AT&T notes,
§251(c)(3) requires that incumbent LECs provide unbundled “access
to [their] network elements.”
We do not find the statute so clear. Although
§251(c)(2) does not expressly require that incumbent LECs lease
facilities to provide interconnection, it also does not expressly
excuse them from doing so. The statute says nothing about what an
incumbent LEC must do to “provide … interconnection.” §251(c)(2).
“[T]he facilities and equipment of any [competing] carrier”
identifies the equipment that an incumbent LEC must allow to
interconnect, but it does not specify what the incumbent LEC must
do to make the interconnection possible.
Ibid.
B
In the absence of any
unambiguous statute or regulation, we turn to the FCC’s
interpretation of its regulations in its amicus brief. See,
e.g., Chase Bank USA, N. A. v.
McCoy, 562 U. S. ___, ___ (2011) (slip op., at 12). As we
reaffirmed earlier this Term, we defer to an agency’s
interpretation of its regulations, even in a legal brief, unless
the interpretation is “ ‘plainly erroneous or inconsistent
with the regulation[s]’ ” or there is any other “ ‘reason
to suspect that the interpretation does not reflect the agency’s
fair and considered judgment on the matter in question.’ ”
Id., at ___, ___ (slip op., at 12, 14) (quoting
Auer v.
Robbins,
519 U. S. 452, 461, 462
(1997)).
The Commission contends that its
regulations require AT&T to provide access at cost-based rates
to its exist- ing entrance facilities for the purpose of
interconnection. The Commission’s interpretation proceeds in three
steps. First, an incumbent LEC must lease “technically feasible”
facilities for interconnection. Second, entrance facili- ties are
among the facilities that an incumbent must make available for
interconnection, if technically feasible. Third, it is technically
feasible to provide access to the particular entrance facilities at
issue in these cases.
1
The Commission first contends
that an incumbent LEC must lease, at cost-based rates, any
requested facilities for obtaining interconnection with the
incumbent LEC’s network, unless it is technically infeasible to do
so. Section 251(c)(2) mandates that an incumbent LEC provide
interconnection, at cost-based rates, “at any technically feasible
point within the carrier’s network.” The FCC has long construed
§251(c)(2) to require incumbent LECs to provide, at cost-based
rates, “any technically feasible method of obtaining
interconnection … at a particular point.” 47 CFR §51.321(a)
(2010).
The requirement in §51.321(a) to
provide a “method of obtaining interconnection,” the Commission
argues, encompasses a duty to lease an existing facility to a
competing LEC. When the Commission originally promulgated
§51.321(a), it explained that incumbent LECs would be required to
“adapt their facilities to interconnection” and to “accept the
novel use of, and modification to, [their] network facilities.”
In re Implementation of Local Competition Provisions in
the Telecommunications Act of 1996, 11 FCC Rcd. 15499, 15605,
¶202 (1996)
(Local Competition Order). Since then, as
AT&T and its
amici concede, incumbent LECs have
commonly leased certain facilities at cost-based prices to
accommodate interconnection. See Brief for Respondent 28–29; Brief
for United States Telecom Association et al. as
Amici
Curiae 33–35.
As additional support for its assertion that
incumbent LECs are obligated to lease facilities, the FCC
highlights the examples in §51.321(b) of “[t]echnically feasible
methods of obtaining interconnection,” which include “[m]eet point
interconnection arrangements.” In a meet-point arrangement, an
incumbent LEC “accommodat[es]” interconnection by building a
transmission facility from its network to a designated point, where
it connects with the competitor’s corresponding transmission
facility.
Local Competition Order ¶553. Compared to that
requirement, the Commission argues, the obligation to lease
existing facilities for interconnection is quite modest.
2
Next, the Commission contends
that existing entrance facilities are among the facilities that an
incumbent LEC must lease for interconnection. According to the FCC,
the
Triennial Review Remand Order adopted a regulatory
def-inition that reestablished that entrance facilities are part of
an incumbent LEC’s network. See ¶137; see also 47 CFR §51.319(e)
(2005). The end of every entrance facility is therefore a “point
within [an incumbent] carrier’s network” at which a competing LEC
could request interconnection, 47 U. S. C. §251(c)(2), and
each entrance facility potentially provides a “technically feasible
method of obtaining interconnection,” 47 CFR §51.321(a) (2010).
3
Finally, the FCC contends that
providing access to the entrance facilities here for
interconnection purposes is technically feasible. Under the
Commission’s regulations, an incumbent LEC bears the burden of
showing that a requested method or point of interconnection is
technically infeasible. See 47 CFR §§51.305(e), 51.321(d); see also
§§51.305(d), 51.321(c) (previously successful intercon-nection is
“substantial evidence” of technical feasibility). AT&T does not
dispute technical feasibility here.[
Footnote 4]
C
The FCC’s interpretation is not
“plainly erroneous or inconsistent with the regulation[s]. ”
Auer,
supra, at 461 (internal quotation marks
omitted). First, we disagree with AT&T’s argument that entrance
facilities are not a part of incumbent LECs’ networks. Indeed, the
Commission’s view on this question is more than reasonable; it is
certainly not plainly erroneous. The
Triennial Review Remand
Order responded to the D. C. Circuit’s decision
questioning the Commission’s earlier finding that entrance
facilities are not network elements. It revised the definition of
dedicated transport—a type of network element—to include entrance
facilities.
Triennial Review Remand Order ¶¶136–137; see
47 CFR §51.319(e)(1) (defining dedicated transport to include
“incumbent LEC transmission facilities … between wire centers or
switches owned by incumbent LECs and switches owned by [competing]
carriers”). Given that revised definition, it is perfectly sensible
to conclude that entrance facilities are a part of incumbent LECs’
networks.
Second, we are not persuaded by
AT&T’s argument that the Commission’s views conflict with the
definition of interconnection in §51.5. That regulation provides:
“Interconnection is the linking of two networks for the mutual
exchange of traffic. This term does not include the transport and
termination of traffic.” AT&T focuses on the definition’s
exclusion of “transport and termination of traffic.” An entrance
facility is a transport facility, AT&T argues, and it makes no
sense to require an incumbent LEC to furnish a transport facility
for interconnection when the definition of interconnection
expressly excludes transport.
We think AT&T reads too much into the
exclusion of “transport.” The regulation cannot possibly mean that
no transport can occur across an interconnection facility, as that
would directly conflict with the statutory language. See §251(c)(2)
(requiring “interconnection … for the transmission and routing of
[local] telephone exchange service”). The very reason for
interconnection is the “mutual exchange of traffic.” 47 CFR §51.5;
see also
Competitive Telecommunications Assn. v.
FCC, 117 F. 3d 1068, 1071–1072 (CA8 1997) (“[T]he
transmission and routing of telephone exchange service” is “what
the interconnection, the physical link, would be used for”
(internal quotation marks omitted)).
The better reading of the regulation is that
it merely reflects that the “transport and termination of traffic”
is subject to different regulatory treatment than interconnection.
Compensation for transport and termination—that is, for delivering
local telephone calls placed by another carrier’s customer—is
governed by separate stat-utory provisions and regulations. See 47
U. S. C. §§251(b)(5), 252(d)(2); 47 CFR §51.701. The
Commission explains that a competitive LEC typically pays one fee
for interconnection—“just for having the link”—and then an
additional fee for the transport and termination of telephone
calls. Tr. of Oral Arg. 28; see also Brief for United States as
Amicus Curiae 3, n. 1. Entrance facilities, at least
when used for the mutual exchange of traffic, seem to us to fall
comfortably within the definition of interconnection. See 597
F. 3d, at 388 (Sutton, J., dissenting) (noting that entrance
facilities are “designed for the very purpose of linking two
carriers’ networks” (internal quotation marks omitted)).
In sum, the Commission’s interpretation of its
regulations is neither plainly erroneous nor inconsistent with the
regulatory text. Contrary to AT&T’s assertion, there is no
danger that deferring to the Commission would effectively “permit
the agency, under the guise of interpreting a regulation, to create
de facto a new regulation.”[
Footnote 5]
Christensen v.
Harris
County,
529 U.
S. 576, 588 (2000).
D
Nor is there any other “reason to
suspect that the interpretation does not reflect the agency’s fair
and considered judgment on the matter in question.”
Auer,
519 U. S., at 462. We are not faced with a
post-hoc
rationalization by Commission counsel of agency action that is
under judicial review. See
ibid.; see also
Burlington
Truck Lines, Inc. v.
United States,
371 U. S. 156, 168–169
(1962) (“The courts may not accept appellate counsel’s
post
hoc rationalizations for agency action; [
SEC v.]
Chenery[
Corp.,
332 U. S. 194 (1947),]
requires that an agency’s discretionary order be upheld, if at all,
on the same basis articulated in the order by the agency
itself”)
. And although the FCC concedes that it is
advancing a novel interpretation of its longstanding
interconnection regulations, novelty alone is not a reason to
refuse deference. The Commission ex-plains that the issue in these
cases did not arise until recently—when it initially eliminated
unbundled access to entrance facilities in the
Triennial Review
Order. Until then, the Commission says, a competitive LEC
typically would elect to lease a cost-priced entrance facility
under §251(c)(3) since entrance facilities leased under §251(c)(3)
could be used for any purpose—
i.e., both interconnection
and backhauling—but entrance facilities leased under §251(c)(2) can
be used only for interconnection. We see no reason to doubt this
explanation.
AT&T suggests that the
Commission is attempting to require under §251(c)(2) what courts
have prevented it from requiring under §251(c)(3) and what the
Commission itself said was
not required in the
Triennial Review Remand Order. Tr. of Oral Arg. 50
(“[T]his is a rear guard effort to preserve [cost-based] pricing
for things that the [C]ommission has said should no longer be
available … at [such] pricing”). We do not think that AT&T is
correct.
1
To begin with, AT&T’s
accusation does not square with the regulatory history. The
Commission was not compelled to eliminate the obligation to lease
unbundled entrance facilities at cost-based rates.
It is true that, prior to the
Triennial Review orders, the Commission twice
unsuccessfully attempted to impose sweeping unbundling requirements
on incumbent LECs. See
Local Competition Order ¶278;
In re Implementation of Local Competition Provisions of
the Telecommunications Act of 1996, 15 FCC Rcd. 3696,
3771–3904, ¶¶162–464 (1999); see also 47 CFR §51.319 (1997);
§51.319 (2000). Each time, the Commission’s efforts were rejected
for taking an unreasonably broad view of “impair[ment]” under
§251(d)(2). See
Iowa Utilities Bd., 525 U. S.
, at
392;
United States Telecom Assn. v.
FCC, 290
F. 3d 415, 421–428 (2002), cert. denied,
538 U. S. 940 (2003). In
the
Triennial Review Order, the Commission once again
reinterpreted the “impair” standard and revised the list of network
elements that incumbents must provide unbundled to competitors.
The Commission’s initial decision to eliminate
the obligation to unbundle entrance facilities, however, was not a
result of the narrower view of impairment mandated by this Court
and the D. C. Circuit. Instead, the Commission determined that
entrance facilities need not be provided on an unbundled basis
under §251(c)(3) on the novel ground that they are not network
elements at all—something no court had ever suggested.
Moreover, since its initial decision to
eliminate the unbundling obligation for entrance facilities, the
Commission has been committed to that position. When the D. C.
Circuit questioned the Commission’s finding that entrance
facilities are not network elements, the Commission responded by
observing that the court “did not reject our conclusion that
incumbent LECs need not unbundle entrance facilities, only the
analysis through which we reached that conclusion.”
Triennial
Review Remand Order ¶137. The Commission then found another
way to support that same conclusion.
2
More importantly, AT&T’s
characterization of what the Commission has done, and is doing, is
inaccurate. The
Triennial Review orders eliminated
incumbent LECs’ obli-gation under §251(c)(3) to provide unbundled
access to entrance facilities. But the FCC emphasized in both
orders that it “d[id] not alter” the obligation on incumbent LECs
under §251(c)(2) to provide facilities for interconnection
purposes.
Triennial Review Order ¶366;
Triennial
Review Remand Order ¶140. Because entrance facilities are used
for backhauling and interconnection purposes, the FCC effectively
eliminated only unbundled access to entrance facilities for
backhauling purposes—a nuance it expressly noted in the first
Triennial Review order.
Triennial Review Order
¶365. That distinction is neither unusual nor ambiguous.[
Footnote 6] In these cases, the
Commission is simply explaining the interconnection obligation that
it left undisturbed in the
Triennial Review orders. We see
no conflict between the
Triennial Review orders and the
Commission’s views expressed here.[
Footnote 7]
We are not concerned that the
Triennial Review Remand Order did not expressly
distinguish between backhauling and interconnection, though
AT&T makes much of that fact. AT&T argues that the
Commission’s holding in the
Triennial Review Remand Order
is broader than that in the
Triennial Review Order. In
AT&T’s view, the Commission concluded in the
Triennial
Review Remand Order that competitors are not impaired if they
lack cost-based access to entrance facilities for backhauling
or interconnection.
There are two flaws with AT&T’s reasoning.
First, as we have discussed, the
Triennial Review Remand
Order reinstated the ultimate conclusion of the
Triennial
Review Order and changed only “the analysis through which [it]
reached that conclusion.”
Triennial Review Remand Order
¶137. Second, unlike §251(c)(3)’s unbundling obligation,
§251(c)(2)’s interconnection obligation does not require the
Commission to consider impairment. As the dissent below observed,
it would be surprising indeed if the FCC had taken the novel step
of incorporating impairment into interconnection without comment.
597 F. 3d, at 389 (opinion of Sutton, J.).
* * *
The FCC as
amicus curiae
has advanced a reasonable interpretation of its regulations, and we
defer to its views. The judgment of the United States Court of
Appeals for the Sixth Circuit is reversed.
It is so ordered.
Justice Kagan took no part in the
consideration or decision of these cases.
Footnote 1
The Solicitor General, joined by counsel for
the FCC, represents that the
amicus brief for the United
States filed in this Court reflects the Commission’s considered
interpretation of its own rules and orders. Brief for United States
as
Amicus Curiae 31. We thus refer to the Government’s
arguments in these cases as those of the agency. See,
e.g.,
Chase Bank USA, N. A. v.
McCoy, 562 U. S. ___, ___ (2011) (slip op., at 8).
Footnote 2
Although the parties and their
amici
disagree over the precise definition of backhauling, they all
appear to agree that backhauling is important to competitive LECs
and occurs when a competitive LEC uses an entrance facility to
transport traffic from a leased portion of an incumbent network to
the competitor’s own facilities. Backhauling does not involve the
exchange of traffic between incumbent and competitive networks.
See,
e.g., Brief for Petitioners in No. 10–329,
p. 25; Brief for United States Telecom Association et al.
as
Amici Curiae 32. It thus differs from
interconnection—“the linking of two networks for the mutual
exchange of traffic.” 47 CFR §51.5 (2010).
Footnote 3
The Ninth Circuit has since joined the
Seventh and Eighth Circuits.
Pacific Bell Tel. Co. v.
California Pub. Util. Comm’n, 621 F. 3d 836
(2010).
Footnote 4
These cases concern only existing entrance
facilities, and the Commission expressly declines to address
whether it reads its regulations to require incumbent LECs to build
new entrance facilities for interconnection. Brief for United
States as
Amicus Curiae 25, n. 7. The Commission
suggests here, as it has before, that additional considerations of
cost or reasonableness might be appropriate if a competitive LEC
were to request that an incumbent LEC build new entrance facilities
for interconnection.
Ibid. (noting that the Commission’s
Wireline Competition Bureau has declined to require an incumbent
LEC to bear the entire cost of building new entrance facilities);
see also
Local Competition Order ¶553 (explaining with
respect to meet-point arrangements that “the parties and state
commissions are in a better position than the Commission to
determine the appropriate distance that would constitute the
required reasonable accommodation of interconnection”). We express
no view on the matter.
Footnote 5
There is no merit to AT&T’s assertion
that the FCC is improperly amending the list of “[t]echnically
feasible methods of obtaining interconnection” set forth in 47 CFR
§51.321(b). By its own terms, that list is nonexhaustive. See
§51.321(b) (“[t]echnically feasible methods of obtaining
interconnection … include, but are not limited to” the listed
examples); see also §51.321(a) (“[A]n incumbent LEC shall provide …
any technically feasible method of obtaining
interconnection” (emphasis added)).
Footnote 6
The Commission has long recognized that a
single facility can be used for different functions and that its
regulatory treatment can vary depending on its use. Unbundled
network elements, for example, may not be used for the exclusive
provision of mobile wireless or long-distance services. 47 CFR
§51.309(b) (2010). Similarly, interconnection arrangements may be
used for local telephone service but not for long-distance
services. §51.305(b).
Footnote 7
The parties and their
amici dispute
whether an incumbent LEC has any way of knowing how a competitive
LEC is using an entrance facility. This technical factual dispute
simply underscores the appropriateness of deferring to the FCC. So
long as the Commission is acting within the scope of its delegated
authority and in accordance with prescribed procedures, it has
greater expertise and stands in a better position than this Court
to make the technical and policy judgments necessary to administer
the complex regulatory program at issue here.
Comments
Be the first to comment
Leave a Comment