OCTOBER TERM, 1991
Syllabus
ROBERTSON, CHIEF, UNITED STATES FOREST SERVICE, ET AL.
v.
SEATTLE AUDUBON SOCIETY ET AL.
CERTIORARI TO THE UNITED STATES COURT OF APPEALS FOR THE NINTH
CIRCUIT
No. 90-1596. Argued December 2, 1991-Decided March 25,1992
Respondent environmental groups filed separate lawsuits
challenging proposed timber harvesting in certain forests managed
by the United States Forest Service and the Bureau of Land
Management (BLM). These forests are home to the northern spotted
owl, an endangered species. Between them, the two lawsuits alleged
violations of five federal statutes. The lower courts preliminarily
enjoined some of the challenged harvesting. In response to this
ongoing litigation, Congress enacted § 318 of the Department of the
Interior and Related Agencies Appropriations Act, 1990, also known
as the Northwest Timber Compromise. Section 318 both required
harvesting and expanded harvesting restrictions. Subsections (b)(3)
and (b)(5) prohibited harvesting altogether in various designated
areas, and subsection (b)(6)(A) stated in part that "Congress
hereby determines and directs that management [of the forests]
according to subsections (b)(3) and (b)(5) ... is adequate
consideration for the purpose of meeting the statutory requirements
that are the basis for [the two cases,]" which were identified by
name and caption number. Both District Courts rejected respondents'
claims that subsection (b)(6)(A) violated Article III of the
Constitution by purporting to direct results in two pending cases.
The Court of Appeals reversed, holding the provision
unconstitutional under
United States v.
Klein, 13
Wall. 128, on the ground that Congress directed a particular
decision in the cases without repealing or amending the statutes
underlying the litigation.
Held: Subsection (b)(6)(A) does not violate Article III.
Pp. 437-441.
(a) The provision compelled changes in law, not results under
old law, by replacing the legal standards underlying the two
original cases with those set forth in subsections (b)(3) and
(b)(5). Before its enactment, respondents' claims would fail only
if the challenged harvesting violated none of the provisions of the
five statutes that formed the basis for the original lawsuits.
Under subsection (b)(6)(A), however, the claims would fail if the
harvesting satisfied both of two new provisions. Thus, subsection
(b)(6)(A)'s operation modified the old provisions. Moreover,
430
there is nothing in the subsection that purported to direct any
particular findings of fact or applications of law to fact. Section
318 reserved judgment on the lawfulness of the timber sales under
old law. It did not instruct the courts whether any particular
timber sales would violate subsections (b)(3) or (b)(5); and it
could not instruct that any particular BLM timber sales were
lawful, because subsection (b)(5) incorporated by reference the
harvesting prohibitions imposed by a BLM agreement not yet in
existence when the Compromise was enacted. Pp. 437-439.
(b) The three textual features of subsection (b)(6)(A) cited by
respondents do not support their argument that the provision
directed findings under old law, rather than supplying new law. The
inclusion of the preface "Congress ... directs that" does not
undermine the conclusion that what Congress directed-to both courts
and agencies-was a change in law. Nor is it significant that the
subsection deemed compliance with the new requirements to "mee[t]"
the old requirements. Although Congress could have modified the old
laws directly, its enactment of an entirely separate statute
modified the old laws through operation of the canon that specific
provisions qualify general ones. Finally, the subsection's explicit
reference to the two pending cases served only to identify the five
statutory requirements that were the basis for those cases. Pp.
439-440.
(c) The Court of Appeals' alternative holding that the provision
could not effect an implied modification of substantive law because
it was embedded in an appropriations measure is also without merit.
Congress may amend a substantive law in an appropriations statute
if it does so clearly, see,
e. g., United States v.
Will, 449 U.
S. 200, 222, and it did so explicitly here. In addition, having
determined that the provision would be unconstitutional unless it
modified previously existing law, the court was obligated to impose
that saving interpretation as long as it was a possible one. See
NLRB v.
Jones &
Laughlin Steel Corp.,
301
(d) Since subsection (b)(6)(A) did amend applicable law, there
is no reason to address the Court of Appeals' interpretation of
Klein. The argument of one of respondents'
amici-that
the provision is unconstitutional even if it amended law because it
swept no more, or little more, broadly than the range of
applications at issue in the pending caseswas not raised below,
squarely considered by the Court of Appeals, or advanced by
respondents here. P.441.
914 F.2d
1311, reversed and remanded.
THOMAS, J., delivered the opinion for a unanimous Court.
431
Solicitor General Starr argued the cause for
petitioners.
With him on the briefs were Acting Assistant Attorney General
Hartman, Deputy Solicitor General Wallace, Clifford M. Sloan, Peter
R. Steen land, Jr., Martin W Matzen, and Anne S. Almy.
Todd T. True argued the cause for respondents. With him
on the brief for respondents Seattle Audubon Society et al. were
John Bonine, Michael Axline, and
Victor M. Sher. Phillip
D. Chadsey filed a brief for respondents Association of 0 &
C Counties et al.
Mark C.
Rutzick filed briefs for
respondents Northwest Forest Resource Council et al. *
JUSTICE THOMAS delivered the opinion of the Court.
In this case we must determine the operation of § 318 of the
Department of the Interior and Related Agencies Appropriations Act,
1990.
I
This case arises out of two challenges to the Federal
Government's continuing efforts to allow the harvesting and sale of
timber from old-growth forests in the Pacific Northwest. These
forests are home to the northern spotted owl, a bird listed as
threatened under the Endangered Species Act of 1973, 16 U. S. C. §
1531
et seq. (1988 ed. and Supp. II), since June 1990. See
55 Fed. Reg. 26114. Harvesting the forests, say environmentalists,
would kill the owls. Restrictions on harvesting, respond local
timber industries, would devastate the region's economy.
*Briefs of
amici curiae urging affirmance were filed for
the State of Florida et al. by
Robert A. Butterworth,
Attorney General of Florida,
Jonathan Glogau, Assistant
Attorney General, and by the Attorneys General for their respective
States as follows:
Grant Woods of Arizona,
Winston
Bryant of Arkansas,
Richard Blumenthal of Connecticut,
Michael E. Carpenter of Maine,
Hubert H. Humphrey III
of Minnesota,
Mike Moore of Mississippi,
Frankie Sue Del
Papa of Nevada,
Robert J. Del Tufo of New
Jersey,
Nicholas J. Spaeth of North Dakota,
Lee Fisher of Ohio, and
Dan Morales of Texas; and for
Public Citizen by
Patti A. Goldman, Alan B. Morrison, and
David C.
Vladeck.
432
Petitioner Robertson is Chief of the United States Forest
Service, which manages 13 national forests in Oregon and Washington
known to contain the northern spotted owl. In 1988, the Service
amended its regional guide to prohibit timber harvesting on certain
designated areas within those forests. Respondent Seattle Audubon
Society (joined by various other environmental groups) and the
Washington Contract Loggers Association (joined by various other
industry groups) filed separate lawsuits in the District Court for
the Western District of Washington, complaining respectively that
the amendment afforded the owl either too little protection, or too
much. Seattle Audubon alleged violations of three federal statutes:
the Migratory Bird Treaty Act (MBTA), 40 Stat. 755, ch. 128, as
amended, 16 U. S. C. § 703
et seq. (1988 ed. and Supp. II);
the National Environmental Policy Act of 1969 (NEPA), 83 Stat. 852,
as amended, 42 U. S. C. §4321
et seq.; and the National
Forest Management Act of 1976 (NFMA), 90 Stat. 2949, as amended, 16
U. S. C. § 1600
et seq. The District Court consolidated the
actions and preliminarily enjoined 163 proposed timber sales.
Seattle Audubon Soc. v.
Robertson, No. 89-160 (WD
Wash., Mar. 24,1989).
Petitioner Lujan is Secretary of the Department of the Interior.
The Bureau of Land Management (BLM), an agency within the
Department, manages several old-growth forests in western Oregon.
Between 1979 and 1983, the BLM developed timber management plans
that permitted harvesting on some areas within these forests and
prohibited it on others. In 1987, the BLM and the Oregon Department
of Fish and Wildlife executed an agreement that expanded the areas
on which harvesting was prohibited. Also in 1987, respondent
Portland Audubon Society (among others) filed suit in the District
Court for the District of Oregon, challenging certain proposed
harvesting under four federal statutes: MBTA; NEPA; the Federal
Land Policy and Management Act of 1976 (FLPMA), 90 Stat. 2744, as
amended, 43
433
u. S. C. § 1701
et seq.; and the Oregon-California
Railroad Land Grant Act (OCLA), 50 Stat. 874, 43 U. S. C. § 1181a.
Twice, the District Court dismissed the action. Twice before
reversing (on grounds not relevant here), the Court of Appeals for
the Ninth Circuit enjoined some of the challenged harvesting
pending appeal. See
Portland Audubon Soc. v.
Lujan,
884 F.2d
1233, 1234 (1989), cert. denied, 494 U. S. 1026 (1990);
Portland Audubon Soc. v.
Hodel, 866
F.2d 302, 304, cert. denied
sub nom. Northwest Forest
Resource Council v.
Portland Audubon Soc., 492 U. S. 911
(1989).
In response to this ongoing litigation, Congress enacted § 318
of the Department of the Interior and Related Agencies
Appropriations Act, 1990, 103 Stat. 745, popularly known as the
Northwest Timber Compromise. The Compromise established a
comprehensive set of rules to govern harvesting within a
geographically and temporally limited domain. By its terms, it
applied only to "the thirteen national forests in Oregon and
Washington and [BLM] districts in western Oregon known to contain
northern spotted owls." § 318(i). It expired automatically on
September 30, 1990, the last day of fiscal year 1990, except that
timber sales offered under § 318 were to remain subject to its
terms for the duration of the applicable sales contracts. §
318(k).
The Compromise both required harvesting and expanded harvesting
restrictions. Subsections (a)(l) and (a)(2) required the Forest
Service and the BLM respectively to offer for sale specified
quantities of timber from the affected lands before the end of
fiscal year 1990. On the other hand, subsections (b)(3) and (b)(5)
prohibited harvesting altogether from various designated areas
within those lands, expanding the applicable administrative
prohibitions and then codifying them for the remainder of the
fiscal year.1 In addition, sub-
1 Subsection (b)(3) provided:
"No timber sales offered pursuant to this section from the
thirteen national forests in Oregon and Washington known to contain
northern spotted owls may occur within [spotted owl habitat areas
(SOHA's)] identified
434
sections (b)(l), (b)(2), and (b)(4) specified general
environmental criteria to govern the selection of harvesting sites
by the Forest Service. Subsection (g)(l) provided for limited,
expedited judicial review of individual timber sales offered under
§318.
This controversy centers around the first sentence of subsection
(b)(6)(A), which stated in part:
"[T]he Congress hereby determines and directs that management of
areas according to subsections (b)(3) and
pursuant to the Final Supplement to the Environmental Impact
Statement for an Amendment to the Pacific Northwest Regional
Guide-Spotted Owl and the accompanying Record of Decision issued by
the Forest Service on December 8, 1988 as adjusted by this
subsection:
"(A) For the Olympic Peninsula Province, which includes the
Olympic National Forest, SORA size is to be 3,200 acres;
"(B) For the Washington Cascades Province, which includes the
Mt.
Baker-Snoqualmie, Okanogan, Wenatchee, and Gifford-Pinchot
National Forests, SORA size is to be 2,600 acres;
"(C) For the Oregon Cascades Province, which includes the
Mt. Rood, Willamette, Rogue River, Deschutes, Winema, and Umpqua
National Forests, SORA size is to be 1,875 acres;
"(D) For the Oregon Coast Range Province, which includes the
Siuslaw National Forest, SORA size is to be 2,500 acres; and
"(E) For the Klamath Mountain Province, which includes the
Siskiyou National Forest, SORA size is to be 1,250 acres.
"(F) All other standards and guidelines contained in the Chief's
Record of Decision are adopted."
Subsection (b)(5) provided:
"No timber sales offered pursuant to this section on Bureau of
Land Mangagement lands in western Oregon known to contain northern
spotted owls shall occur within the 110 areas identified in the
December 22, 1987 agreement, except sales identified in said
agreement, between the Bureau of Land Management and the Oregon
Department of Fish and Wildlife. Not later than thirty days after
enactment of this Act, the Bureau of Land Management, after
consulting with the Oregon Department of Fish and Wildlife and the
United States Fish and Wildlife Service to identify high priority
spotted owl area sites, shall select an additional twelve spotted
owl habitat areas. No timber sales may be offered in the areas
identified pursuant to this subsection during fiscal year
1990."
435
(b)(5) of this section on the thirteen national forests in
Oregon and Washington and Bureau of Land Management lands in
western Oregon known to contain northern spotted owls is adequate
consideration for the purpose of meeting the statutory requirements
that are the basis for the consolidated cases captioned Seattle
Audubon Society et al., v. F. Dale Robertson, Civil No. 89-160 and
Washington Contract Loggers Assoc. et al., v. F. Dale Robertson,
Civil No. 89-99 (order granting preliminary injunction) and the
case Portland Audubon Society et al., v. Manuel Lujan, Jr., Civil
No. 87-1160-FR."
Subsection (b)(6)(A) also declined to pass upon "the legal and
factual adequacy" of the administrative documents produced by the
1988 Forest Service amendment and the 1987 BLM agreement.2
After § 318 was enacted, both the
Seattle Audubon and
Portland Audubon defendants sought dismissal, arguing that
the provision had temporarily superseded all statutes on which the
plaintiffs' challenges had been based. The
2 In its entirety, subsection (b)(6)(A) provided:
''Without passing on the legal and factual adequacy of the Final
Supplement to the Environmental Impact Statement for an Amendment
to the Pacific Northwest Regional Guide-Spotted Owl Guidelines and
the accompanying Record of Decision issued by the Forest Service on
December 8, 1988 or the December 22, 1987 agreement between the
Bureau of Land Management and the Oregon Department of Fish and
Wildlife for management of the Spotted Owl, the Congress hereby
determines and directs that management of areas according to
subsections (b)(3) and (b)(5) of this section on the thirteen
national forests in Oregon and Washington and Bureau of Land
Management lands in western Oregon known to contain northern
spotted owls is adequate consideration for the purpose of meeting
the statutory requirements that are the basis for the consolidated
cases captioned Seattle Audubon Society et al., v. F. Dale
Robertson, Civil No. 89-160 and Washington Contract Loggers Assoc.
et al., v. F. Dale Robertson, Civil No. 89-99 (order granting
preliminary injunction) and the case Portland Audubon Society et
al., v. Manuel Lujan, Jr., Civil No. 87-1160-FR. The guidelines
adopted by subsections (b)(3) and (b)(5) of this section shall not
be subject to judicial review by any court of the United
States."
436
plaintiffs resisted on the ground that the first sentence of
subsection (b)(6)(A), because it purported to direct the results in
two pending cases, violated Article III of the Constitution. In
Seattle Audubon, the District Court held that subsection
(b)(6)(A) "can and must be read as a temporary modification of the
environmental laws."
Seattle Audubon Soc. v.
Robertson, No. 89-160 (WD Wash., Nov. 14, 1989). Under that
construction, the court upheld the provision as constitutional and
therefore vacated its preliminary injunction. Nonetheless, the
court retained jurisdiction to determine whether the challenged
harvesting would violate § 318 (if done in fiscal year 1990) or
other provisions (if done later). In
Portland Audubon, the
District Court likewise upheld subsection (b)(6)(A), but dismissed
the action entirely (without prejudice to future challenges arising
after fiscal year
1990). Portland Audubon Soc. v.
Lujan, No. 87-1160 (Ore., Dec. 21, 1989).
The Ninth Circuit consolidated the ensuing appeals and reversed.
914 F.2d
1311 (1990). The court held that the first sentence of §
318(b)(6)(A) "does not, by its plain language, repeal or amend the
environmental laws underlying this litigation," but rather "directs
the court to reach a specific result and make certain factual
findings under existing law in connection with two [pending]
cases."
Id., at 1316. Given that interpretation, the court
held the provision unconstitutional under
United States v.
Klein, 13 Wall. 128 (1872), which it construed as
prohibiting Congress from "direct[ing] ... a particular decision in
a case, without repealing or amending the law underlying the
litigation." 914 F. 2d, at 1315. The Ninth Circuit distinguished
this Court's decision in
Pennsylvania v.
Wheeling
&
Belmont Bridge Co., 18 How. 421 (1856), which it
construed as permitting Congress to
"amend or repeal any
law, even for the purpose of ending pending litigation." 914 F. 2d,
at 1315 (emphasis in original).
437
On remand, the plaintiffs renewed their original claims.
In
Seattle Audubon, the District Court enjoined under
NFMA 16 timber sales offered by the Forest Service during fiscal
year 1990 in order to meet its harvesting quota under § 318(a)(1).
See
Seattle Audubon Soc. v.
Robertson, No. 89160 (WD
Wash., Dec. 18, 1990, and May 24, 1991). While the District Court
proceedings were ongoing, the agencies jointly sought review of the
Ninth Circuit's judgment that the first sentence of subsection
(b)(6)(A) was unconstitutional. We granted certiorari, 501 U. S.
1249 (1991), and now reverse.3
II
The first sentence of subsection (b)(6)(A) provided that
"management of areas according to subsections (b)(3) and (b)(5) ...
is adequate consideration for the purpose of meeting the statutory
requirements that are the basis for
[Seattle Audubon] and
[Portland Audubon]." The Ninth Circuit held that this
language did not "amend" any previously existing "laws," but rather
"direct[edJ" certain "factual findings" and "specific result[sJ"
under those laws. 914 F. 2d, at 1316. Petitioners interpret the
provision differently. They argue that subsection (b)(6)(A)
replaced the legal standards underlying the two original challenges
with those set forth in subsections (b)(3) and (b)(5), without
directing particular applications under either the old or the new
standards. We agree.
We describe the operation of subsection (b)(6)(A) by example.
The plaintiffs in both cases alleged violations of MBTA § 2, 16 U.
S. C. § 703, which makes it unlawful to "kill" or "take" any
"migratory bird." Before the Compromise was
3 Because no timber sales offered by the BLM during fiscal year
1990 were ever enjoined, the § 318 controversy between Portland
Audubon and the BLM appears moot. We decide the case, however,
because there remains a live controversy between Seattle Audubon
and the Forest Service over the 16 sales offered during fiscal year
1990 and still enjoined under the NFMA.
438
enacted, the courts adjudicating these MBTA claims were obliged
to determine whether the challenged harvesting would "kill" or
"take" any northern spotted owl, within the meaning of § 2.4
Subsection (b)(6)(A), however, raised the question whether the
harvesting would violate different prohibitions-those described in
subsections (b)(3) and (b)(5). If not, then the harvesting would
constitute "management ... according to" subsections (b)(3) and
(b)(5), and would therefore be deemed to "mee[t]" MBTA § 2
regardless of whether or not it would cause an otherwise prohibited
killing or taking. Thus under subsection (b)(6)(A), the agencies
could satisfy their MBTA obligations in either of two ways: by
managing their lands so as neither to "kill" nor "take" any
northern spotted owl within the meaning of § 2, or by managing
their lands so as not to violate the prohibitions of subsections
(b)(3) and (b)(5). Subsection (b)(6)(A) operated identically as
well upon all provisions of NEPA, NFMA, FLPMA, and OCLA that formed
"the basis for" the originallawsuits.
We conclude that subsection (b)(6)(A) compelled changes in law,
not findings or results under old law. Before subsection (b)(6)(A)
was enacted, the original claims would fail only if the challenged
harvesting violated none of five old provisions. Under subsection
(b)(6)(A), by contrast, those same claims would fail if the
harvesting violated neither of two new provisions. Its operation,
we think, modified the old provisions. Moreover, we find nothing in
subsection (b)(6)(A) that purported to direct any particular
findings of fact or applications of law, old or new, to fact. For
challenges to sales offered before or after fiscal year 1990,
subsection (b)(6)(A) expressly reserved judgment upon "the legal
and factual adequacy" of the administrative documents authorizing
the sales. For challenges to sales offered during fiscal year 1990,
subsection (g)(l) expressly provided
4 The northern spotted owl is a "migratory bird" within the
meaning of MBTA. See 50 CFR § 10.13 (1991).
439
for
judicial determination of the lawfulness of those
sales. Section 318 did not instruct the courts whether any
particular timber sales would violate subsections (b)(3) and
(b)(5), just as the MBTA, for example, does not instruct the courts
whether particular sales would "kill" or "take" any northern
spotted owl. Indeed, § 318
could not instruct that any
particular BLM timber sales were lawful under the new standards,
because subsection (b)(5) incorporated by reference the harvesting
prohibitions imposed by a BLM agreement not yet in existence when
the Compromise was enacted. See
Respondents cite three textual features of subsection (b)(6)(A)
in support of their conclusion that the provision failed to supply
new law, but directed results under old law. First, they emphasize
the imperative tone of the provision, by which Congress
"determine[d] and direct[ed]" that compliance with two new
provisions would constitute compliance with five old ones.
Respondents argue that "Congress was directing the subsection
[only] at the courts." Brief for Respondents Seattle Audubon
Society et al. 34. Petitioners, for their part, construe the
subsection as "a directive [only] to the Forest Service and BLM."
Brief for Petitioners 30. We think that neither characterization is
entirely correct. A statutory directive binds
both the
executive officials who administer the statute
and the
judges who apply it in particular cases-even if (as is usually the
case) Congress fails to preface its directive with an empty phrase
like "Congress ... directs that." Here, we fail to see how
inclusion of the "Congress ... directs that" preface undermines our
conclusion that what Congress directed-to agencies and courts
alike-was a change in law, not specific results under old law.
Second, respondents argue that subsection (b)(6)(A) did not
modify old requirements because it deemed compliance with new
requirements to "mee[t]" the old requirements. We fail to
appreciate the significance of this observation. Congress might
have modified MBTA directly, for example,
440
in order to impose a new obligation of complying either with the
current § 2 or with subsections (b)(3) and (b)(5). Instead,
Congress enacted an entirely separate statute deeming compliance
with subsections (b)(3) and (b)(5) to constitute compliance with §
2-a "modification" of the MBTA, we conclude, through operation of
the canon that specific provisions qualify general ones, see,
e.
g., Simpson v.
United States, 435 U. S. 6, 15 (1978). As
explained above, each formulation would have produced an identical
task for a court adjudicating the MBTA claims-determining either
that the challenged harvesting did not violate § 2 as currently
written or that it did not violate subsections (b)(3) and
(b)(5).
Finally, respondents emphasize that subsection (b)(6)(A)
explicitly made reference to pending cases identified by name and
caption number. The reference to
Seattle Audubon and
Portland Audubon, however, served only to identify the five
"statutory requirements that are the basis for" those casesnamely,
pertinent provisions of MBTA, NEPA, NFMA, FLPMA, and OCLA.
Subsection (b)(6)(A) named two pending cases in order to identify
five statutory provisions. To the extent that subsection (b)(6)(A)
affected the adjudication of the cases, it did so by effectively
modifiying the provisions at issue in those cases.
In the alternative, the Ninth Circuit held that subsection
(b)(6)(A) "could not" effect an implied modification of substantive
law because it was embedded in an appropriations measure. See 914
F. 2d, at 1317. This reasoning contains several errors. First,
although repeals by implication are especially disfavored in the
appropriations context, see,
e. g., TVA v.
Hill, 437 U.
S. 153, 190 (1978), Congress nonetheless may amend substantive
law in an appropriations statute, as long as it does so clearly.
See,
e. g., United States v.
Will, 449 U. S. 200, 222
(1980). Second, because subsection (b)(6)(A) provided
by its
terms that compliance with certain new law constituted
compliance with certain old law, the intent to modify was not only
clear, but express. Third,
441
having determined that subsection (b)(6)(A) would be
unconstitutional unless it modified previously existing law, the
court then became obliged to impose that "saving interpretation,"
914 F. 2d, at 1317, as long as it was a "possible" one. See
NLRB v.
Jones &
Laughlin Steel Corp.,
301 U. S. 1, 30
(1937) ("[A]s between two possible interpretations of a statute, by
one of which it would be unconstitutional and by the other valid,
our plain duty is to adopt that which will save the act").
We have no occasion to address any broad question of Article III
jurisprudence. The Court of Appeals held that subsection (b)(6)(A)
was unconstitutional under
Klein because it directed
decisions in pending cases without amending any law. Because we
conclude that subsection (b)(6)(A)
did amend applicable law,
we need not consider whether this reading of
Klein is
correct. The Court of Appeals stated additionally that a statute
would be constitutional under
Wheeling Bridge if it did
amend law. Respondents'
amicus Public Citizen challenges
this proposition. It contends that even a change in law,
prospectively applied, would be unconstitutional if the change
swept no more broadly, or little more broadly, than the range of
applications at issue in the pending cases. This alternative theory
was neither raised below nor squarely considered by the Court of
Appeals; nor was it advanced by respondents in this Court.
Accordingly, we decline to address it here. The judgment of the
Court of Appeals is reversed, and the case is remanded for further
proceedings consistent with this opinion.
It is so ordered.